Confirm the included preparation
Ask who handles furniture, old floor removal, trim and disposal. Do not assume an installation quote includes every task. Identify built-in fittings and fragile items that must stay protected.
Clear the working area and route
Move personal belongings and agree the handling of larger furniture. Keep the route to the rooms accessible. Discuss pets, children and occupied areas so the work zone and essential access are planned.
Provide suitable material storage
The product may need delivery before fitting or defined acclimation conditions. Use a suitable dry area and maintain the specified environment. Delivery timing alone does not establish installation readiness.
Finish related work in the right order
Other renovations can affect the floor through moisture, dust or traffic. Coordinate painting, cabinets and wet work with the installation plan. The correct order depends on the material and project.
Share concerns before work starts
Mention squeaks, previous leaks and changes in floor height. Read about flooring installation and subfloor preparation to identify what should be checked before fitting.